Hero Background
CFD Analysis — Fire Safety & Ventilation Simulation

Simulate the airflow
before it's built.

From fire safety engineering — car parks, tunnels, smoke and heat venting, escape time — to ventilation system design for HVAC, indoor climate, and air quality, our CFD simulations give you evidence before a single fan or damper is installed.

5 +

Countries our engineering services are delivered across

10 + yrs

Of engineering & CAD service experience behind every simulation

200 +

Engineers and technical staff across our global team

CFD Simulations for FSE /Car Parks & Tunnels /Smoke & Heat Venting /Escape Time Analysis /Ventilation System Design /HVAC Systems /Indoor Climate /Air Quality Management /Data Centres & Clean Rooms /Theatres, Offices & Airports /Thermal Load Simulation /Application Engineering /CFD Simulations for FSE /Car Parks & Tunnels /Smoke & Heat Venting /Escape Time Analysis /Ventilation System Design /HVAC Systems /Indoor Climate /Air Quality Management /Data Centres & Clean Rooms /Theatres, Offices & Airports /Thermal Load Simulation /Application Engineering /
01

CFD Simulations for Car Parks & Tunnels

We run CFD simulations for fire safety engineering in car parks and tunnels, modeling how smoke, heat, and airflow behave under real fire scenarios so ventilation and extraction systems can be sized and validated before construction.

Request a Car Park / Tunnel Simulation
CFD Simulations for Car Parks & Tunnels
How We Work

Build the Geometry

Car park / tunnel 3D domain

Define Fire Scenarios

Heat release rate & location

Run the Simulation

Airflow, smoke & heat spread

Validate Design

Ventilation sizing & compliance

Key Deliverables
Car Park & Tunnel Ventilation Simulation01
Fire Safety Engineering (FSE) Scenarios02
Design Validation Against Local Codes03
02

Smoke & Heat Venting Systems

We model smoke and heat venting systems to confirm that extraction rates, vent placement, and system capacity perform as intended under fire conditions — giving designers evidence-based confidence ahead of approval.

Request Venting System Analysis
Smoke & Heat Venting Systems
How We Work

Model the Vent System

Extraction points & ductwork

Simulate Heat & Smoke

Transient fire conditions

Check Extraction Rates

Capacity against design intent

Optimize Placement

Vent & inlet positioning

Key Deliverables
Smoke & Heat Venting System Modeling01
Ventilation Rate & Extraction Point Optimization02
Performance-Based Design Support03
03

Smoke Spread, Thermal Load & Escape Time

We calculate smoke spread, thermal load, and escape time under fire scenarios, providing the tenability evidence that supports performance-based fire strategies and building control submissions.

Request Escape Time Analysis
Smoke Spread, Thermal Load & Escape Time
How We Work

Set Fire Scenarios

Growth curve & ignition point

Track Smoke Spread

Time-based visibility & toxicity

Calculate Thermal Load

Temperature exposure over time

Confirm Escape Time

Tenability vs. egress duration

Key Deliverables
Smoke Spread & Thermal Load Modeling01
Available Safe Egress Time (Escape Time)02
Evidence for Building Control & Approvals03
04

HVAC & Indoor Climate Simulation

We run CFD simulations for ventilation system design — modeling HVAC airflow, indoor climate, and air quality so mechanical designs deliver the comfort and air quality outcomes they were specified for.

Request an HVAC Simulation
HVAC & Indoor Climate Simulation
How We Work

Model the Space

HVAC layout & boundary conditions

Simulate Airflow

Supply, return & diffusion patterns

Check Thermal Comfort

Temperature & velocity distribution

Assess Air Quality

Contaminant & fresh-air distribution

Key Deliverables
HVAC System Airflow Simulation01
Indoor Climate & Thermal Comfort Modeling02
Air Quality Management03
05

Specialized & Critical Environments

Some spaces carry tighter tolerances than a typical HVAC design — theatres, offices, and airports for occupant comfort at scale; data centres, clean rooms, and other special rooms for precise temperature, humidity, and contamination control. We simulate each to its own criteria.

Request a Specialized Room Simulation
Specialized & Critical Environments
How We Work

Identify Criteria

Occupancy, cleanliness or thermal spec

Simulate the Environment

Theatre, airport, data centre or clean room

Validate Against Spec

Class, comfort or safety criteria

Issue Findings

Report ready for design sign-off

Key Deliverables
Theatres, Offices & Airports01
Data Centres, Clean Rooms & Special Rooms02
Application-Specific Ventilation Strategies03
CFD analysis

Fluid dynamics simulation for fire safety and ventilation design, backed by a KPO team built for MEP..

Our CFD analysis covers two connected disciplines: CFD simulations for fire safety engineering — car parks and tunnels, smoke and heat venting systems, smoke spread, thermal load, and escape time — and CFD simulations for ventilation system design, covering HVAC systems, indoor climate, and air quality management across theatres, offices, airports, data centres, clean rooms, and other special rooms.

CFD Analysis sits inside our broader application engineering offering — the same team that handles CAD drafting, BIM, and detailed engineering support also delivers the precise calculations and analysis behind fire safety and ventilation design. With reliable KPO services, we aim to set the benchmark in the industry, ensuring optimal efficiency and functionality in the MEP systems our simulations inform.

Countries
5+

Engineering services delivered internationally

Experience
10+ yrs

Engineering & CAD service expertise

Team
200+

Engineers and CAD professionals in India & Qatar

Disciplines
7+

Services under one engineering team, CFD included

Tools we work in
Let's start a conversation

Outsource your CFD analysis

Send us your building geometry and design intent — fire safety or ventilation — and we'll scope a CFD study to support your design and approvals. No commitment, no cost.

How it works

From geometry to
simulation-backed evidence.

A structured approach that keeps every stage of your project coordinated, transparent, and moving forward.

01

You send the geometry

Share your 3D model or drawings and the design question — fire safety or ventilation performance.

02

Scope the scenario

We confirm fire scenarios or airflow conditions to simulate, and the criteria to validate against.

03

Build the model

Geometry, boundary conditions, and fire or airflow parameters are set up for simulation.

04

Run the CFD study

We simulate smoke spread, thermal load, escape time, or HVAC airflow and indoor climate as required.

05

Review findings

Results are reviewed against your design intent and local code requirements before reporting.

06

Deliver the report

A clear, evidence-based report is issued, ready to support design decisions or regulatory submission.

Client results

What application engineering
clients are saying

"Jersey Engineering has significantly enhanced our custom air handling business with their excellent selection, drawing, and submittal services, reinforcing its importance within our offerings and strengthening our position in the applied market."

D & B Building Systems
Partner

"Their prompt and reliable service has been crucial in saving time, cutting costs, and improving customer satisfaction across our engineering programs."

D & B Building Systems
Partner

"The CFD study gave our fire strategy the evidence it needed for approval — clear scenarios, clear results, no back-and-forth with the reviewing authority."

MEP Design Consultant
Fire Safety Coordinator

"Their ventilation simulation caught a comfort issue in our design before it reached site — a fix that would have been far more expensive after installation."

HVAC Design Firm
Design Engineer

CFD Analysis FAQ

Frequently asked
questions.

Two connected disciplines: CFD simulations for fire safety engineering (car parks, tunnels, smoke and heat venting systems, smoke spread, thermal load, and escape time) and CFD simulations for ventilation system design (HVAC systems, indoor climate, and air quality management).

Got a CFD analysis
question?

Send us your building geometry and design intent — fire safety or ventilation — and we'll scope a CFD study to support your design and approvals. No commitment, no cost.

Talk to us